Skip to content
NUL-G

Custom software for manufacturing.

For machine builders and suppliers who work to customer drawings, with a quote, bill of materials and file for each order.

No obligation · six questions · reply within one to two working days

Who we build for

  • Machine building
  • Metalworking and supply
  • High-tech supply
  • Defence supply

What is happening.

What is changing in manufacturing.

  1. 01

    New requirements for machinery

    The Machinery Regulation applies from 20 January 2027. Cybersecurity and recording software changes then become requirements in the technical file.

  2. 02

    Software in your product

    From 11 September 2026, you must report vulnerabilities in products with software, in full from December 2027. You need to know what software is in each product.

  3. 03

    Quotes based on experience

    A quote on a drawing takes hours from an experienced estimator, while you win only some of them. Only after the order do you know whether the hours were right.

  4. 04

    Every order its own drawing

    With one-offs and small batches, every order has its own drawing, revision and file. A standard ERP assumes repetition.

Where it can be better.

Six processes from day-to-day operations in manufacturing.

How it works now
The estimator works out material, machine hours and set-up time from a drawing or STEP file.
What could be better
Less senior time per quote, since you win only some of them.

Demo company › Quotes

  • OF-2417 · frame 5120 rev B
  • Material
  • Operations
  • Outsourced
Estimate so far
€14,860
Machine and labour
31 hours
Open items
3
ItemDescriptionSourceStatus1–8 of 9
M1Stainless 316 sheet · 4 mm · 86 kgCalculated10:20
M2Box section 60x60x4 · 24 mCalculated10:18
B1Laser cutting · 42 partsCalculated10:12
B2Press braking · 18 bendsCalculated09:58
B3Press brake set-up timeProposed 2.5 hours09:40
B4Welding · 11.4 m fillet weldCalculated09:31
U1Pickling and passivatingAwaiting priceyesterday
D1MarginOpenyesterday
Proposal

Actuals from three similar frames show 2.5 hours of set-up time on the press brake. The estimate allowed one hour.The estimator sets the price.

Use actualsAdjust

Example. Demo company; names and figures are fictitious.

All processes

The system proposes. You decide.

The system reads, checks and prepares. A person decides what happens.

Per process: what the system does and who decides
ProcessWhat the system doesWho decides
Quotes on customer drawingsWhat the system does: A cost estimate from the drawing or STEP file, at your own rates. And afterwards you see whether it was right.Who decides: The estimator sets the price.
Bill of materials and engineering changeWhat the system does: From EBOM to MBOM without retyping. For each change, you see which orders, purchasing and stock it affects.Who decides: The engineer decides how the change is implemented.
Work preparation and planningWhat the system does: Routing and capacity per machine group in one schedule. You see overruns as they happen, not afterwards.Who decides: The production planner approves every move.
Quality file per deliveryWhat the system does: Certificates, inspection reports, FAI and welding records per delivery in one file. You see what is missing or wrong before it ships.Who decides: Quality decides on releasing the delivery.
Nonconformities and 8DWhat the system does: Every nonconformity with an owner, an 8D and a deadline. And you see when the same fault comes back.Who decides: The quality manager decides on root cause and corrective action.
Technical file and CEWhat the system does: Risk assessment, technical file and manual per machine variant, kept up to date. Every software change recorded against the risk it affects.Who decides: The CE coordinator reassesses the risk.

Compliance you can prove.

What the rules in manufacturing ask, and what the system records.

Rules for manufacturing: what the inspector asks and what the system records
RuleThe inspector asksThe system records
Machinery RegulationApplies from 20 January 2027: digital manuals are allowed; cybersecurity and recording software changes become requirements.Logging of software changesChanges per machine
EN 1090 and EN ISO 3834CE marking of structures and requirements for the welding process.Welding process and CE markingWelders, welding procedure and inspection
Cyber Resilience ActDuty to report vulnerabilities from 11 September 2026, in full from 11 December 2027.Reporting vulnerabilitiesReport and follow-up
Cyberbeveiligingswet (Dutch NIS2 Act)Since 15 August 2026 for part of the manufacturing industry.Duty of care and duty to reportAccess and incidents
For every sector
GDPRWho processes personal data, and whereData processing agreement, EU hosting with ISO 27001-certified partners
AI ActHuman oversight of AIEvery proposal with who approved it

Start here.

One process, one prototype. Then you decide.

Start with your quotes on customer drawings, or with the quality file for each delivery.

  1. Step 01

    Conversation

    A process map

  2. Step 02

    Prototype

    A prototype

  3. Step 03

    Build

    A go or no-go per phase

  4. Step 04

    In operation

    Your code, your data

Systems you may already use

  • Isah
  • Ridder iQ
  • MKG
  • Exact
  • SAP
  • Business Central
  • SolidWorks PDM
  • Teamcenter

We connect to what is there, or build alongside it where the package is too heavy or too rigid.

Where we are not the right fit

If your production runs in large series on a standard ERP, you need us less. We build for one-offs and small batches made to customer drawings.

Questions.

About costs, time, integrations and ownership.

What does it cost?

Most systems we build cost between €10,000 and €40,000, one-off. Support is about 3 to 5% of that, per month. After the prototype you get a fixed price, before you sign anything.

How long does it take?

We set that after the prototype, per phase. We do not give a timeframe before then.

How much of our time does it take?

One owner who makes the decisions, and a few users who review and test during the build. We agree the exact amount per project.

Does it connect to our ERP and Microsoft?

Yes. Users sign in with their own Microsoft account and MFA. We set out in the proposal which ERP and file integrations are included.

Who owns the software?

You do. The rights transfer per phase, once that phase is paid. No licence.

Where is it hosted?

In the EU, encrypted: EU hosting with ISO 27001-certified partners.

Who maintains it?

We do, under an SLA. Or you do: the documentation is written for that.

People

  • Jelle Nodelijk, Partner · process and first conversation
  • Mike de Beste, Partner · build and technology
  • Jeroen Romeijnders, Partner · sectors and prototypes

You talk to the people who build it: Jelle, Mike and Jeroen. No account manager, no middleman.

About us

Show us one process that could be lighter.

Get a working prototype

No obligation · six questions · reply within one to two working days. Or get in touch