Skip to content
NUL-G

Access and attendance.

Know who is on site. At any moment.

No obligation · six questions · reply within one to two working days

What it often comes down to.

In the words of the people who do the work.

  1. 01

    Knowing who is on site

    Visitors, contractors and drivers sign in on paper or in a separate system. In an evacuation, no one knows for sure who is inside.

  2. 02

    Bringing in contractors takes weeks

    During a turnaround or a large project, hundreds of external workers come on site. Everyone has to be checked, inducted and scheduled, often within a few weeks.

What it does.

The system proposes. A person decides.

  • Sign in at the gate with a QR code or pass, linked to the contractor portal.
  • Checks induction, certificates and permit before anyone enters.
  • An up-to-date attendance list for evacuations, on phone and screen.
What the system does
Reads ID or certificates and flags what does not match.
A person decides
The gate officer or HSE lets people in or turns them away.

What it looks like.

Know who is on site. At any moment.

Demo company › Access

  • Now
  • In-house
  • Contractors
  • Visitors
On site now
64
Waiting at the gate
2
Refused
1
PassName and companyZoneStatus1–8 of 64
P-4410M. de Boer · in-houseOn site since 07:0208:10
P-4433K. Yilmaz · cleaningOn site since 07:1508:12
P-4451T. de Graaf · insulationOn site since 07:3108:31
P-4460S. Vos · coatingRefused · induction09:02
B-0912L. Smits · visitorEscorted09:14
C-0071T. Jansen · driverAwaiting induction09:40
P-4471D. Kok · mechanicalAwaiting pass check10:05
P-4475A. Mulder · inspectionOn site since 08:0210:21
64 people on site, by zoneEvacuation list

Example. Demo company; names and figures are fictitious.

Where it applies.

In these sectors, and how it works there now.

Access and attendance: where it applies, by sector
Sector and processHow it works nowWhat could be better
Energy & chemicalsTurnaround or shutdownNow: Hundreds of contractors arrive within a few weeks. Planning, scope and permits run through separate lists.What could be better: Onboarding, certificates and permits in place together, and overruns visible while you can still adjust.
Energy & chemicalsAdmitting contractorsNow: Contractors send VCA, GWO and induction records by email. The gate checks on paper.What could be better: Only valid certificates through the gate, and an up-to-date list of who is on site during an evacuation.

Compliance you can prove.

Rules this process helps with, and what they ask.

Access and attendance: rules and what they ask
RuleWhat it isWhat it asks
VCA and H&S planConstruction & infrastructureSafety of staff, and a plan for each project.Who is on the construction site, and whether they are certified.

Show us one process that could be lighter.

Get a working prototype

No obligation · six questions · reply within one to two working days. Or get in touch