    Work permits go round on paper

    Requests, checks and sign-offs happen on paper. No one sees at a glance what work is running, and where it clashes.

  2. 02

    Bringing in contractors takes weeks

    During a turnaround or a large project, hundreds of external workers come on site. Everyone has to be checked, inducted and scheduled, often within a few weeks.

What it does.

The system proposes. A person decides.

  • Request on a tablet or phone, with set questions for the TRA and LMRA.
  • Checks the certificates of whoever does the work, and clashes with other permits in the same place.
  • Shows what is running at each location now, and records every step.
What the system does
Proposes risks and control measures based on the installation and earlier permits.
A person decides
The authorised issuer approves and issues the permit.

What it looks like.

Every permit handled digitally: requested, checked, issued and closed out.

Demo company › Work permits

  • Today
  • In progress
  • Awaiting issue
  • Closed
Open today
12
Waiting for a person
3
Blocked
2
No.Work and zonePerformed byStatus1–8 of 12
2318Hot work · pipeline 4 · zone BIssued · gas 07:0210:05
2319Confined space · tank 12 · zone CAwaiting issue10:32
2320Welding · jetty 3 · zone BBlocked · certificate07:11
2321Electrical · pump pit · zone AAwaiting LOTO07:26
2322Hot work · flange 7 · zone BClash with 231807:41
2323Inspection · tank 7 · zone CIn progress08:02
2324Lifting · jetty 3 · zone BAwaiting TRA08:21
2325Painting · line 9 · zone AClosedyesterday
Proposal

Gas test 10:31 in tank 12: O₂ 20.9%, LEL 0%, H₂S 0 ppm. Valid until 14:31.The permit issuer reviews and issues.

Issue as permit issuerAdjust

Example. Demo company; names and figures are fictitious.

Where it applies.

In these sectors, and how it works there now.

Work permits: where it applies, by sector
Sector and processHow it works nowWhat could be better
Energy & chemicalsWork permits and LOTONow: Permits are requested, checked and signed off on paper. Energy sources are isolated from a list.What could be better: Seeing at a glance what is running and where it clashes, with certificates checked without manual work.
Energy & chemicalsTRA and LMRANow: Risks are assessed per task on a form, just before work starts.What could be better: Reusing risks instead of writing them down again, with lessons from earlier work included.

Compliance you can prove.

Rules this process helps with, and what they ask.

Work permits: rules and what they ask
RuleWhat it isWhat it asks
BRZO (Dutch Major Accident Hazards Decree)Energy & chemicalsCompanies holding large quantities of hazardous substances must show that their safety management works.Inspectors ask for evidence: permits, MoC, incidents and follow-up.

Show us one process that could be lighter.

Get a working prototype

No obligation · six questions · reply within one to two working days. Or get in touch